Framing of the second floor is almost complete. We can "feel" the size and extent of each room. All the skylights are in: two in the master bedroom, one in master bathroom, and one above the staircase. Will has done the "angled" framing around the skylight so that the light will be spread around as much as possible. In the meantime, the repointing of the bricks for the entire house is almost over. New openings for the windows and french door have been made.
Wednesday, February 11, 2009
New framing in, repointing almost over
Framing of the second floor is almost complete. We can "feel" the size and extent of each room. All the skylights are in: two in the master bedroom, one in master bathroom, and one above the staircase. Will has done the "angled" framing around the skylight so that the light will be spread around as much as possible. In the meantime, the repointing of the bricks for the entire house is almost over. New openings for the windows and french door have been made.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment